Checked November 28, 2026 · sources listed on the page · no paid placements
Drain field size calculator
Square feet of trench, feet of leach line and the yard it takes — from your bedrooms and perc rate.
Drain field size vs. perc rate
| Perc rate (min/in) | GA sq ft per bedroom | GA: 3-bedroom total | PA: 3-bedroom total |
|---|---|---|---|
| 5 | 125 | 375 | unsuitable |
| 10 | 165 | 495 | 476 |
| 15 | 190 | 570 | 476 |
| 20 | 210 | 630 | 556 |
| 30 | 250 | 750 | 716 |
| 45 | 300 | 900 | 896 |
| 60 | 335 | 1,005 | 1,064 |
| 75 | 365 | 1,095 | 1,202 |
| 90 | 380 | 1,140 | 1,340 |
What the numbers mean in your yard
The figure is trench bottom area — the gravel or chamber floor that soaks effluent into the soil. Georgia caps trenches at 36 inches wide and spaces laterals at least 7 ft center to center, so a 750 sq ft requirement is 250 ft of 3-ft trench and roughly 1,750 sq ft of lawn once spacing is counted. Many counties also ask for a reserve area for a future repair field — ask yours.
- Faster than about 5 min/inch (coarse sand, gravel): water passes before the soil can treat it. Pennsylvania rules out in-ground beds below 6 min/inch.
- 5–30 min/inch: the comfortable range for a conventional trench system.
- 30–90 min/inch: still workable, but fields grow fast — 60 min/inch needs 2.7× the area of 5 min/inch in Georgia's table. Pennsylvania requires pressure dosing above 60.
- Slower than 90 min/inch: no conventional field on lots under 3 acres in Georgia; Pennsylvania only allows an elevated sand mound (to 180 min/inch). See mound system cost.
Keep the field working
Fields fail when solids escape the tank, when they flood, or when they are compacted. EPA's advice: pump on schedule, keep roof drains and sump pumps away, never drive or park on the field, and plant only grass (full routine: septic system maintenance). Plan pump-outs with the septic pumping planner; read how a drain field works and what replacement costs.
Questions homeowners ask
How big is a drain field for a 3-bedroom house?
In Georgia's table, 375 sq ft of trench bottom at 5 min/inch, 750 at 30 min/inch and 1,005 at 60 min/inch. Other states use similar curves.
How long should leach lines be?
Divide the trench-bottom area by trench width: 750 sq ft at 3 ft wide is 250 ft, usually split into several laterals.
Does an aerobic system shrink the drain field?
Often. Pennsylvania permits a one-third reduction with an aerobic tank in parts of Table A; Georgia allows reductions for systems producing Class I effluent.
Sources
- Georgia DPH – Manual for On-Site Sewage Management Systems, Sections D and F (March 2026) — dph.georgia.gov
- 25 Pa. Code § 73.16 – Absorption area requirements (Table A) — pacodeandbulletin.gov
- U.S. EPA – How to Care for Your Septic System (SepticSmart) — epa.gov
- U.S. EPA – Types of Septic Systems — epa.gov
Checked November 28, 2026. Prices are published national ranges in U.S. dollars, not quotes; your installer's written estimate is what counts.